|
|
|
Industries We Serve
Substation
Project Profiles Archive
|
|
 |
2008 Cedar Rapids, IA Flood |
|
| Client: |
Alliant Energy |
| Completed: |
June 2008 |
| Location: |
Cedar Rapids, IA |
| Description: |
Flood event lasted from June 8 to July 1. With storms and historic flooding in the roughly 1700 city blocks in the Cedar Rapids area, 32,000 Alliant Energy customers were without power as the Cedar River crested over 32 feet. Alliant Energy’s emergency operations center was evacuated. A temporary substation was constructed to provide power to customers. |
|
| View Project Profile |
|
 |
345 kV Switchyard Fox River Energy Center |
|
| Client: |
American Transmission Company |
| Completed: |
May 2005 |
| Location: |
Wisconsin |
| Description: |
Installation of grounding, conduit, cable trenching, structures, conductor, equipment, control cable, wiring of equipment, and surface rock for a six breaker ring switchyard. |
|
| View Project Profile |
|
Get the free Adobe Acrobat Reader The OnSite Newsletters are in Adobe PDF format. You may download a free copy of the Reader by clicking here and following the directions on Adobe's web site.
|
|