Overhead Line
Substation
Underground Electric Construction
Line Clearance Tree Trimming
Plumbing
Process Piping
Fire Protection
Custom Metals Fabrication
HVAC
Wind Energy
Environmental Sensitivity
Solar Hot-Water Heating
Water Reclamation
LEED Certification
Geothermal
Project Management
Safety
Fleet Services
Virtual Design and Construction
General Heating and Air Conditioning
Large Project Capabilities
Emergency Response
Safety
History
Community Outreach
Team Leaders
News and Announcements
OnSite Newsletter
Operations
Corporate
Project Inquiry
Overhead Line
Substation
Underground Electric Construction
Line Clearance Tree Trimming
Plumbing
Process Piping
Fire Protection
Custom Metals Fabrication
Marketing / Website Feedback
Friday, May 18, 2012 Print Share Home Site Map Employee E-Mail / Logon
Get the Flash Player to see this movie.

Industries We Serve

Substation

Project Profiles

161 kV Bent Tree Wind Farm

161 kV Bent Tree Wind Farm


Owner: Alliant Energy
General Contractor: Alliant Energy
Completed: September 2010
Location: Minnesota
Description: 4.2 Mi of 161 kV T2 795 single circuit conductor installed while taking extensive environmental precautions because of torrential rainfall that created sensitive soil conditions throughout project construction.

View Project Profile


34.5 / 230 kV Bison I Wind Farm Substations

34.5 / 230 kV Bison I Wind Farm Substations


Owner: Minnesota Power
Completed: September 2010
Location: North Dakota
Description: Construction of the new 34.5 / 230 kV Bison substation as well as the expansion of the existing 230 kV Square Butte Substation.

View Project Profile


345 kV EPC Fowler Ridge II Wind Farm

345 kV EPC Fowler Ridge II Wind Farm


Client: BP Wind Energy
Client: Mortenson Construction
Completed: Collector Substation & Interconnection Modification - September 2009; Switchyard - September 2009
Location: Indiana
Description: 345 kV Collector Substation, Interconnect Substation modifications, and construction of a new Switchyard. Engineered, procured and constructed in five months.

View Project Profile


345 kV Mitchell County Switchyard

345 kV Mitchell County Switchyard


Owner: ITC/Alliant Energy
Completed: October 2008
Location: Iowa
Description: A Greenfield installation to supply an interconnect point for renewable generation being constructed in the area.

View Project Profile


345/230 kV Above Grade Construction - Arrowhead Substation

345/230 kV Above Grade Construction - Arrowhead Substation


Client: Minnesota Power
Completed: November 2007
Location: Wisconsin
Description: 345 kV, 230 kV, and 115 kV facility constructed to serve as the western terminal of the Arrowhead-Weston 345 kV transmission line.

View Project Profile


Archive

Alliant 2008 Flood
345/138 kV North Madison Substation Above Grade
345 kV Switchyard Fox River Energy Center
345 kV Substation Arcadian-Oak Creek